• DocumentCode
    727674
  • Title

    A heuristic algorithm for integrated production and transportation scheduling with multiple transportation modes

  • Author

    Longchao Chen ; Jing Yang ; Zhaoxia Guo

  • Author_Institution
    Bus. Sch., Sichuan Univ., Chengdu, China
  • fYear
    2015
  • fDate
    22-24 June 2015
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    This paper addressed an integrated production and transportation scheduling problem in a global MTO supply chain environment with single manufacturer, multiple customers and multiple transportation modes. A mixed integer nonlinear programming model is established. A heuristic algorithm based on forward scheduling is proposed to handle the model. Based on real industrial data, the performance of the heuristic algorithm is compared with the performances generated by 3 methods including genetic algorithm. The comparison results show that the performance of the proposed algorithms is better than the 3 methods.
  • Keywords
    genetic algorithms; integer programming; nonlinear programming; supply chains; transportation; forward scheduling; genetic algorithm; global MTO supply chain environment; integrated production and transportation scheduling problem; mixed integer nonlinear programming model; multiple customers; multiple transportation modes; single manufacturer; Bismuth; Heuristic algorithms; Job shop scheduling; Supply chains; Transportation; forward scheduling; genetic algorithm; heuristic algorithm; mixed integer nonlinear programming; supply chain scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Systems and Service Management (ICSSSM), 2015 12th International Conference on
  • Conference_Location
    Guangzhou
  • Print_ISBN
    978-1-4799-8327-8
  • Type

    conf

  • DOI
    10.1109/ICSSSM.2015.7170221
  • Filename
    7170221