DocumentCode
727702
Title
A two-machine flowshop with unavailability interval on the second machine
Author
Chen Ke-jia ; Jin Lian ; Wang Xiao
Author_Institution
Sch. of Econ. & Manage., Fuzhou Univ., Fuzhou, China
fYear
2015
fDate
22-24 June 2015
Firstpage
1
Lastpage
5
Abstract
The paper studies a two-machine flowshop with unavailability interval on the second machine. Contrary to most literature where machines are available at all times, this means that the machine may not always be available during the scheduling period, it needs a constant time to maintain the machine after completing a fixed number of jobs at most. The objective is to find the optimal job schedule such that the makespan is minimized. We focus on the relationship between the solution and the Johnson rule, and the performance of the Johnson rule as a heuristic when the job is resumable, analysis the worse-case performance ratio of the Johnson rule as a heuristic. Demonstrate the complexity of the problem when the job is nonresumable.
Keywords
flow shop scheduling; minimisation; Johnson rule; makespan minimization; optimal job scheduling; second machine unavailability interval; two-machine flowshop scheduling; worst-case performance ratio; Approximation methods; Heuristic algorithms; Job shop scheduling; Operations research; Processor scheduling; Schedules; flowshop scheduling; heuristic algorithm; two-machine; unavailability interval; worst-case performance ratio;
fLanguage
English
Publisher
ieee
Conference_Titel
Service Systems and Service Management (ICSSSM), 2015 12th International Conference on
Conference_Location
Guangzhou
Print_ISBN
978-1-4799-8327-8
Type
conf
DOI
10.1109/ICSSSM.2015.7170269
Filename
7170269
Link To Document