DocumentCode
728103
Title
An enhanced method for the determination of the ramping reserves
Author
Muzhikyan, Aramazd ; Farid, Amro M. ; Youcef-Toumi, Kamal
Author_Institution
Dept. of Eng. Syst. & Manage., Masdar Inst. of Sci. & Technol., Abu Dhabi, United Arab Emirates
fYear
2015
fDate
1-3 July 2015
Firstpage
994
Lastpage
1001
Abstract
Power generation reserves play a central role for maintaining the balance of generation and consumption. Reserves, scheduled in advance, compensate for forecast error, variability and transmission losses. However, as reserves are a costly commodity, their amount should be carefully assessed to prevent unnecessary expense. Currently, the quantity of required reserves are determined based upon a posteriori methods that use operator´s experience and established assumptions. While these assumptions have been made out of a level of engineering practicality, they may not be formally true given the numerical evidence. The earlier “sister” paper to this work presented a method to determine the quantity of load following reserves a priori. This paper now uses a similar methodology to determine the quantity of ramping reserves.
Keywords
load forecasting; power generation reliability; power generation scheduling; forecast error; posteriori methods; power generation reserves; ramping reserves; transmission losses; Load forecasting; Propagation losses; Schedules; Scheduling; Standards; TV;
fLanguage
English
Publisher
ieee
Conference_Titel
American Control Conference (ACC), 2015
Conference_Location
Chicago, IL
Print_ISBN
978-1-4799-8685-9
Type
conf
DOI
10.1109/ACC.2015.7170863
Filename
7170863
Link To Document