• DocumentCode
    7282
  • Title

    An Efficient Parallel Algorithm for Large Scale Hydrothermal System Operation Planning

  • Author

    Pinto, Roberto J. ; Borges, Carmen L. T. ; Maceira, M.E.P.

  • Author_Institution
    CEPEL-Power Res. Center, Rio de Janeiro, Brazil
  • Volume
    28
  • Issue
    4
  • fYear
    2013
  • fDate
    Nov. 2013
  • Firstpage
    4888
  • Lastpage
    4896
  • Abstract
    This paper presents an efficient parallel algorithm applied to the problem of large scale hydrothermal system operation planning. This problem is solved by stochastic dual dynamic programming. A plan of operation is determined for each stage of the planning period with the objective of minimizing the expected cost of operation over the planning horizon. For each state, the hydrothermal operation problem is modeled as a linear programming problem and the dual variables associated with the solution are used to construct the Benders cuts. The plan of operation is represented by the future cost function, which is approximated by a piecewise linear function, constructed iteratively by the Benders cuts. An optimized parallelization strategy is applied to both the forward and backward cycles of the dynamic programming convergence process with very high parallel efficiency. For a planning horizon of 5 years and 200 inflow scenarios for each reservoir, the sequential solution for the Brazilian system requires almost 15 hours of processing time. The parallel algorithm obtains exactly the same solution in less than 23 min on 64 cores and in less than 17 min on 128 cores.
  • Keywords
    costing; dynamic programming; hydrothermal power systems; linear programming; piecewise linear techniques; power generation planning; reservoirs; stochastic programming; Benders cuts; Brazilian system; cost function; dual variables; dynamic programming convergence process; efficient parallel algorithm; hydrothermal operation problem; large scale hydrothermal system operation planning; linear programming problem; operation cost; optimized parallelization strategy; piecewise linear function; planning horizon; planning period; reservoir; sequential solution; stochastic dual dynamic programming; Large scale hydrothermal systems; medium term operation planning; parallel processing; stochastic dual dynamic programming;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/TPWRS.2012.2236654
  • Filename
    6493512