DocumentCode
736842
Title
Design of Space Resource Constrained Project Scheduling System
Author
Huanyu, Liu ; Tianyu, Wen
fYear
2015
fDate
13-14 June 2015
Firstpage
366
Lastpage
369
Abstract
On the basis of the spatial resources index R-tree structure, and considering the demands of space resource capacity index, the space distance is calculated by using the road network model, the resource retrieval index is introduced into the cloud resources layout optimization strategy, it puts forward a kind of effective and general Top-k sub-graph pattern matching scheme, in terms of applicability this scheme can get the correct Top-k matching results for a variety of complex structure with or without ring connected query graphs, The query graph matching scheme for ring structure is generating tree cost estimate matching schemes, and in which chooses the most optimized generated tree, which is used as a query sub-tree to expand matching results. Finally in the algorithm performance testing phase, the used RDF graphs data comes from DBLP real experimental data, this algorithm not only obtains accurately Top-k matching results, but also verifies the feasibility that generating tree cost estimate matching schemes to choose the most optimized generated tree for expanding and matching, Secondly by comprehensive comparison with the performance of existing Top-k GPM connection algorithm in time and space, the test results show that its time performance has been improved a lot based on the consumption of a certain memory space.
Keywords
Algorithm design and analysis; Data mining; Indexes; Layout; Pattern matching; Portfolios; Roads; Capacity indicator; Road network; Spatial resources index; Top-k algorithm;
fLanguage
English
Publisher
ieee
Conference_Titel
Measuring Technology and Mechatronics Automation (ICMTMA), 2015 Seventh International Conference on
Conference_Location
Nanchang, China
Print_ISBN
978-1-4673-7142-1
Type
conf
DOI
10.1109/ICMTMA.2015.94
Filename
7263587
Link To Document