• DocumentCode
    765442
  • Title

    Short-term hydro generation and interchange contract scheduling for Swiss Rail

  • Author

    Christoforidis, Milton ; Awobamise, Bola ; Frowd, Roderick J. ; Rahimi, Farrokh A. ; Tong, Sai ; Aganagic, Muhamed

  • Author_Institution
    Swiss Rail, Zollikofen, Switzerland
  • Volume
    11
  • Issue
    1
  • fYear
    1996
  • fDate
    2/1/1996 12:00:00 AM
  • Firstpage
    274
  • Lastpage
    280
  • Abstract
    This paper describes the Short-Term Resource Scheduling (STRS) function that has been developed by Siemens-Empros as part of the new SBB/Direktion Kraftwerk (Swiss Rail) Energy Management System. Optimal scheduling of the single-phase hydro plants, single-phase and three-phase energy accounts, and purchase and sale of three phase energy subject to a multitude of physical and contractual constraints (including spinning and resulting reserve requirements) is the main objective of the STRS function. The operations planning horizon of STRS is one day to one week using an hourly time increment
  • Keywords
    hydroelectric power stations; integer programming; linear programming; load management; railways; scheduling; Energy Management System; SBB/Direktion Kraftwerk; Short-Term Resource Scheduling; Swiss Rail; frequency converter; interchange contract scheduling; mixed integer linear programming; operations planning horizon; optimal scheduling; short-term hydro generation; single-phase energy accounts; single-phase hydro plants; spinning reserve; three-phase energy accounts; Contracts; Frequency conversion; Job shop scheduling; Marketing and sales; Mixed integer linear programming; Optimal scheduling; Rails; Reservoirs; Senior members; Spinning;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.486106
  • Filename
    486106