• DocumentCode
    775204
  • Title

    Experimental and External-Proton-Beam Magnet Power-Supply Systems at the Bevatron

  • Author

    Jackson, Leslie T.

  • Author_Institution
    Lawrence Radiation Laboratory, University of California Berkeley, California
  • Volume
    12
  • Issue
    3
  • fYear
    1965
  • fDate
    6/1/1965 12:00:00 AM
  • Firstpage
    416
  • Lastpage
    420
  • Abstract
    Magnet power-supply systems for both experimental and external-proton-beam (EPB) magnets used at the Bevatron are described as feedback control systems. Individual components contained in the systems are also described. The power-controlling component first used in the supplies was a three-phase magnetic amplifier. Silicon-controlled-rectifier (SCR) bridges are being used now. The requirements placed on the experimental magnet supply systems are ±0.1% current regulation with ±10% line-voltage perturbations occurring every pulse of the Bevatron. The EPB systems must track to at least ±0.1% a dynamic signal closely related to the proton beam energy. The performance criteria for EPB systems involve both error coefficients and transient response.
  • Keywords
    Bridge circuits; Control system synthesis; Frequency; Magnetic separation; Power supplies; Pulse amplifiers; Pulsed power supplies; Temperature distribution; Thyristors; Voltage;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1965.4323665
  • Filename
    4323665