DocumentCode
77531
Title
Avoid Miscues During Electrical Switching: Create and Follow Clear, Preplanned, Written Procedures
Author
Hill, Dennis J. ; L´Esperance, Kenneth A.
Author_Institution
URS, Cleveland, OH, USA
Volume
21
Issue
3
fYear
2015
fDate
May-June 2015
Firstpage
27
Lastpage
39
Abstract
The operation of electrical power systems is often accomplished safely with planned written switching orders or procedures. These procedures are usually step-by-step executable plans detailing the necessary actions to energize, de-energize, isolate, or alter the configuration of an electrical system for maintenance. Written switching procedures afford the electrical operations crew the opportunity to address preemptively the risks, necessary personnel, notifications, personal protective equipment (PPE), and lockout items needed for safe switching. This article reviews the applicable regulations, technical documentation, risk management, resources, emergency reparation, review/approval, and other basics of developing a successful switching procedure.
Keywords
maintenance engineering; personnel; power system security; risk management; switches; PPE; clear procedure; electrical operations; electrical power systems; electrical switching; electrical system; emergency reparation; maintenance; necessary personnel; personal protective equipment; planned written switching orders; preplanned procedure; risk management; safe switching; technical documentation; written procedure; Electrical safety; Maintenance engineering; Occupational safety; Power distribution; Power system management; Switching circuits;
fLanguage
English
Journal_Title
Industry Applications Magazine, IEEE
Publisher
ieee
ISSN
1077-2618
Type
jour
DOI
10.1109/MIAS.2014.2345803
Filename
7047731
Link To Document