Controlling Accelerator Engineering Costs
Author
Avery, R.T. ; Breuner, D.J.
Author_Institution
William M. Brobeck & Associates, Berkeley, California
Volume
12
Issue
3
fYear
1965
fDate
6/1/1965 12:00:00 AM
Firstpage
540
Lastpage
543
Abstract
Cost control for accelerator engineering involves task definition, planning related expenditures, measuring progress, tabulation of costs and projections, and, most important of all, follow-up for corrections. Accelerator engineering costs are best regulated by the accelerator engineer, since those who are in any way detached from the work cannot exercise the most effective control. The accelerator engineer should be assisted by providing him with an effective system, appropriate forms and reports, and administrative support.
Keywords
Acceleration; Buildings; Costs; Electrical engineering; Life estimation; Mechanical engineering; Physics; Scheduling; Technical drawing; Testing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1965.4323691
Filename
4323691
Link To Document