    Controlling Accelerator Engineering Costs

  • Author

    Avery, R.T. ; Breuner, D.J.

  • Author_Institution
    William M. Brobeck & Associates, Berkeley, California
  • Volume
    12
  • Issue
    3
  • fYear
    1965
  • fDate
    6/1/1965 12:00:00 AM
  • Firstpage
    540
  • Lastpage
    543
  • Abstract
    Cost control for accelerator engineering involves task definition, planning related expenditures, measuring progress, tabulation of costs and projections, and, most important of all, follow-up for corrections. Accelerator engineering costs are best regulated by the accelerator engineer, since those who are in any way detached from the work cannot exercise the most effective control. The accelerator engineer should be assisted by providing him with an effective system, appropriate forms and reports, and administrative support.
  • Keywords
    Acceleration; Buildings; Costs; Electrical engineering; Life estimation; Mechanical engineering; Physics; Scheduling; Technical drawing; Testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1965.4323691
  • Filename
    4323691