• DocumentCode
    776248
  • Title

    Robustness results concerning EDF scheduling upon uniform multiprocessors

  • Author

    Baruah, Sanjoy ; Funk, Shelby ; Goossens, Joël

  • Author_Institution
    Dept. of Comput. Sci., North Carolina Univ., Chapel Hill, NC, USA
  • Volume
    52
  • Issue
    9
  • fYear
    2003
  • Firstpage
    1185
  • Lastpage
    1195
  • Abstract
    Each processor in a uniform multiprocessor machine is characterized by a speed or computing capacity, with the interpretation that a job executing on a processor with speed s for t time units completes (s × t) units of execution. The earliest deadline first (EDF) scheduling of hard-real-time systems upon uniform multiprocessor machines is considered. It is known that online algorithms tend to perform very poorly in scheduling such hard-real-time systems on multiprocessors; resource-augmentation techniques are presented here that permit online algorithms in general (EDF in particular) to perform better than may be expected given these inherent limitations. It is shown that EDF scheduling upon uniform multiprocessors is robust with respect to both job execution requirements and processor computing capacity.
  • Keywords
    multiprocessing systems; performance evaluation; processor scheduling; real-time systems; resource allocation; EDF scheduling; earliest deadline first scheduling; hard-real-time systems; job execution requirements; online algorithms; performance; processor computing capacity; resource-augmentation techniques; robustness; uniform multiprocessors; Computational complexity; Costs; Multiprocessing systems; Processor scheduling; Real time systems; Robustness; Scheduling algorithm;
  • fLanguage
    English
  • Journal_Title
    Computers, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9340
  • Type

    jour

  • DOI
    10.1109/TC.2003.1228513
  • Filename
    1228513