Title :
New Personnel Interlock System and Procedures for the RPI Linac Lab
Author :
Morse, D.S. ; Haken, J. ; Ryan, R.M.
Author_Institution :
Rensselaer Polytechnic Institute Linac Lab Troy, New York
fDate :
6/1/1969 12:00:00 AM
Abstract :
Experience indicates that periodic modification to personnel interlock system operating procedures (nuisance modifications) increase user awareness. A modular interlock system which permits easy modification of the forced inspection sequence has been designed and installed at the RPI Accelerator Laboratory. The system provides for forced area inspection within specified time periods. Audible signals alert workers when the inspection is in progress.
Keywords :
Economic indicators; Fires; Inspection; Laboratories; Linear particle accelerator; Neutrons; Personnel; Plugs; Presses; Protection;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1969.4325306