DocumentCode :
791943
Title :
New Personnel Interlock System and Procedures for the RPI Linac Lab
Author :
Morse, D.S. ; Haken, J. ; Ryan, R.M.
Author_Institution :
Rensselaer Polytechnic Institute Linac Lab Troy, New York
Volume :
16
Issue :
3
fYear :
1969
fDate :
6/1/1969 12:00:00 AM
Firstpage :
584
Lastpage :
585
Abstract :
Experience indicates that periodic modification to personnel interlock system operating procedures (nuisance modifications) increase user awareness. A modular interlock system which permits easy modification of the forced inspection sequence has been designed and installed at the RPI Accelerator Laboratory. The system provides for forced area inspection within specified time periods. Audible signals alert workers when the inspection is in progress.
Keywords :
Economic indicators; Fires; Inspection; Laboratories; Linear particle accelerator; Neutrons; Personnel; Plugs; Presses; Protection;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1969.4325306
Filename :
4325306
Link To Document :
بازگشت