• DocumentCode
    796062
  • Title

    Evaluation of Computer-Based Mine Monitoring and Control at Barnes and Tucker Mine 20

  • Author

    Berzonsky, Bruce E. ; Breuil, Felix Du ; Yingling, Jon C.

  • Author_Institution
    Barnes and Tucker Coal Company, 1912 Chestnut Avenue, Barnesboro, PA 15714, USA.
  • Issue
    5
  • fYear
    1985
  • Firstpage
    1121
  • Lastpage
    1126
  • Abstract
    A program is being conducted to demonstrate the use of centralized computer control of all conveyors from face to preparation plant. The system incorporates the National Coal Board´s MINOS supplied by Hawker Siddeley Dynamics Engineering and a telephone/pager system supplied by Mine Safety Appliances. This paper summarizes results to date of the demonstration which will provide documentation of installation requirements, operating experience, and impact of the system on mine operations; and will provide information to evaluate the system´s capabilities and its potential as a management tool. Sponsored initially by the Department of Energy and later turned over to the Bureau of Mines, the program, scheduled to continue for another two years, also involves Barnes and Tucker Coal Company, the Bituminous Coal Research (BCR) National Laboratory, and the coal industry through the BCR Mine Monitoring and Communications Committee.
  • Keywords
    Centralized control; Communications Committee; Computerized monitoring; Documentation; Fuel processing industries; Home appliances; Job shop scheduling; Laboratories; Safety; Telephony;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/TIA.1985.349514
  • Filename
    4158114