DocumentCode
796062
Title
Evaluation of Computer-Based Mine Monitoring and Control at Barnes and Tucker Mine 20
Author
Berzonsky, Bruce E. ; Breuil, Felix Du ; Yingling, Jon C.
Author_Institution
Barnes and Tucker Coal Company, 1912 Chestnut Avenue, Barnesboro, PA 15714, USA.
Issue
5
fYear
1985
Firstpage
1121
Lastpage
1126
Abstract
A program is being conducted to demonstrate the use of centralized computer control of all conveyors from face to preparation plant. The system incorporates the National Coal Board´s MINOS supplied by Hawker Siddeley Dynamics Engineering and a telephone/pager system supplied by Mine Safety Appliances. This paper summarizes results to date of the demonstration which will provide documentation of installation requirements, operating experience, and impact of the system on mine operations; and will provide information to evaluate the system´s capabilities and its potential as a management tool. Sponsored initially by the Department of Energy and later turned over to the Bureau of Mines, the program, scheduled to continue for another two years, also involves Barnes and Tucker Coal Company, the Bituminous Coal Research (BCR) National Laboratory, and the coal industry through the BCR Mine Monitoring and Communications Committee.
Keywords
Centralized control; Communications Committee; Computerized monitoring; Documentation; Fuel processing industries; Home appliances; Job shop scheduling; Laboratories; Safety; Telephony;
fLanguage
English
Journal_Title
Industry Applications, IEEE Transactions on
Publisher
ieee
ISSN
0093-9994
Type
jour
DOI
10.1109/TIA.1985.349514
Filename
4158114
Link To Document