  • Abstract
    Distribution planners are facing a new reality: the vast majority of new generation currently being connected to the grid is through the distribution system. This "edge" of the grid, where utilities have the least amount of visibility and controllability, is also where most of the change is occurring. The result is a new set of challenges associated with further integrating these ever increasing levels of distributed energy resources (DERs). To meet these challenges, an integrated approach for planning is needed.
  • Keywords
    distributed power generation; power distribution control; power distribution planning; power grids; DER; distributed energy resources; distribution planners; distribution system; integrated grid; Density estimation robust algorithm; Electricity supply industry; Power distribution planning; Production; Substations; Voltage control; Voltage measurement;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2014.2379855
  • Filename
    7048005