• DocumentCode
    799569
  • Title

    Optimal control of a resource-sharing multiprocessor with periodic maintenance

  • Author

    Kogan, Konstantin ; Lou, Sheldon ; Herbon, Avi

  • Author_Institution
    Dept. of Interdisciplinary Studies-Logistics, Bar-Ilan Univ., Ramat-Gan, Israel
  • Volume
    47
  • Issue
    8
  • fYear
    2002
  • fDate
    8/1/2002 12:00:00 AM
  • Firstpage
    1342
  • Lastpage
    1346
  • Abstract
    Shared resources and the processes that control them play a critical role in the functioning of concurrent systems. The article analyzes the production control of a workstation producing a number of products concurrently. The workstation is periodically stopped for maintenance. The objective of the production control is to minimize inventory and backlog costs over an infinite time horizon. Using the maximum principle and under the so-called agreeable cost structure, we derive the optimal production control. We prove that under this cost structure, the problem can be solved in polynomial time.
  • Keywords
    duality (mathematics); maximum principle; production control; agreeable cost structure; backlog costs; concurrent systems; infinite time horizon; inventory costs; maximum principle; optimal control; periodic maintenance; polynomial time problem; production control; resource-sharing multiprocessor; shared resources; workstation; Adaptive control; Automatic control; Control systems; Differential equations; Nonlinear control systems; Nonlinear systems; Optimal control; Production control; Rivers; Workstations;
  • fLanguage
    English
  • Journal_Title
    Automatic Control, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9286
  • Type

    jour

  • DOI
    10.1109/TAC.2002.800747
  • Filename
    1024349