• DocumentCode
    801276
  • Title

    Plugging into the Zeitgeist

  • Author

    Braun, Martin ; Arnold, Gunter ; Laukamp, Hermann

  • Author_Institution
    Decentralized Ancillary Services, ISET in Kassel, Kassel
  • Volume
    7
  • Issue
    3
  • fYear
    2009
  • Firstpage
    63
  • Lastpage
    76
  • Abstract
    Germany is the country with the largest installed PV capacity in the world. As a result, Germany needs to be one of the first countries to look at adequate network integration. To tackle the challenges of the power system with regard to high PV penetration in the future, incentive systems are already formed and prepared that go one step further with regard to system integration. Also, grid codes for grid connection to the distribution network are defined that require grid-supportive behavior from PV systems. Real network integration by providing ancillary services for system operation is the aim of these new measures in Germany. Integration studies with different perspectives are performed in Germany.
  • Keywords
    photovoltaic power systems; power generation economics; power generation reliability; Germany; PV capacity; active customer networks; ancillary services; commercial aggregation concepts; distribution network; grid codes; grid connection; photovoltaic network integration; Biomass; Energy consumption; Hydroelectric power generation; Photovoltaic systems; Power generation; Power supplies; Renewable energy resources; Solar power generation; Wind energy generation; Wind turbines;
  • fLanguage
    English
  • Journal_Title
    Power and Energy Magazine, IEEE
  • Publisher
    ieee
  • ISSN
    1540-7977
  • Type

    jour

  • DOI
    10.1109/MPE.2009.932309
  • Filename
    4907282