Abstract
Germany is the country with the largest installed PV capacity in the world. As a result, Germany needs to be one of the first countries to look at adequate network integration. To tackle the challenges of the power system with regard to high PV penetration in the future, incentive systems are already formed and prepared that go one step further with regard to system integration. Also, grid codes for grid connection to the distribution network are defined that require grid-supportive behavior from PV systems. Real network integration by providing ancillary services for system operation is the aim of these new measures in Germany. Integration studies with different perspectives are performed in Germany.
Keywords
photovoltaic power systems; power generation economics; power generation reliability; Germany; PV capacity; active customer networks; ancillary services; commercial aggregation concepts; distribution network; grid codes; grid connection; photovoltaic network integration; Biomass; Energy consumption; Hydroelectric power generation; Photovoltaic systems; Power generation; Power supplies; Renewable energy resources; Solar power generation; Wind energy generation; Wind turbines;
fLanguage
English
Journal_Title
Power and Energy Magazine, IEEE
Publisher
ieee
ISSN
1540-7977
Type
jour
DOI
10.1109/MPE.2009.932309
Filename
4907282
Link To Document