• DocumentCode
    809385
  • Title

    Optimum scheduling of power systems using functional analysis

  • Author

    El-hawary, M.E. ; Christensen, G.S.

  • Author_Institution
    University of Alberta, Edmonton, Alberta, Canada
  • Volume
    17
  • Issue
    4
  • fYear
    1972
  • fDate
    8/1/1972 12:00:00 AM
  • Firstpage
    518
  • Lastpage
    522
  • Abstract
    Optimum scheduling of a hydrothermal power system with variable head hydroplants is discussed. Functional analysis is Used to obtain the optimum solution for the scheduling problem. The problem is formulated as a minimum norm problem. The optimum solution found is unique and is easily shown to agree with the solution found for a simpler problem formulated earlier. An example is given to illustrate the results obtained.
  • Keywords
    Hydro-thermal power generation; Load dispatching; Optimization methods; Power generation scheduling; Automatic control; Control systems; Costs; Functional analysis; Optimal control; Power system analysis computing; Power system control; Power system stability; Power system transients; Switches;
  • fLanguage
    English
  • Journal_Title
    Automatic Control, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9286
  • Type

    jour

  • DOI
    10.1109/TAC.1972.1100048
  • Filename
    1100048