Title :
Construction Experience within the Control and Spreading Room Complex
Author_Institution :
Bechtel Corporation San Francisco, California
Abstract :
This is a report on some construction problems within the control room and its associated cable spreading rooms that are due to space limitations, poor access for electricians, and state-of-the-art changes initiated during the testing phases of a nuclear generating plant. The effects of these problems on manpower are discussed. Solutions for the specific problems are suggested in conjunction with the overall recommendation for more active participation by the construction engineer with the designers, manufacturers, and clients in regard to initial layout of these critical areas, including wire space allowances in the control packages.
Keywords :
Cable shielding; Circuits; Flame retardants; Personnel; Power cables; Process control; Space technology; Testing; Wire; Wiring;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1974.4327584