DocumentCode :
818407
Title :
Bates Linac Operational Experience
Author :
Sargent, C.P. ; Turchinetz, W. ; Weaver, J.N.
Author_Institution :
Bates Linear Accelerator, MIT-LNS Middleton, Massachusetts
Volume :
22
Issue :
3
fYear :
1975
fDate :
6/1/1975 12:00:00 AM
Firstpage :
1341
Lastpage :
1342
Abstract :
Accelerator operation during the first year of scheduled beam to physics experiments is described. Some details of the gun, RF, water, vacuum, control and monitoring systems are reviewed with reference to performance and reliability.
Keywords :
Centralized control; Colliding beam accelerators; Control systems; Linear accelerators; Linear particle accelerator; Particle beams; Physics; Radio frequency; Relays; Stability;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1975.4327882
Filename :
4327882
Link To Document :
بازگشت