• DocumentCode
    821820
  • Title

    A heuristic approach to load shedding scheme

  • Author

    Shah, S. ; Shahidehpour, S.M.

  • Author_Institution
    Dept. of Electr. & Comput. Eng., Illinois Inst. of Technol., Chicago, IL, USA
  • Volume
    4
  • Issue
    4
  • fYear
    1989
  • fDate
    11/1/1989 12:00:00 AM
  • Firstpage
    1421
  • Lastpage
    1429
  • Abstract
    The authors describe some of the present problems which exist in the operation of power systems, and how an expert system can be utilized to enhance the performance of the system by implementing load shedding as one of alternatives in the restoration of a large-scale power system. The proposed method is part of an integrated package of power system restoration which helps a system operator recognize bottlenecks in the operation of the system and develop strategies for providing reliable service to customers. The governing rules for load shedding are introduced, and the proposed approach is implemented on a six-bus and the IEEE 30-bus system
  • Keywords
    expert systems; load shedding; power engineering computing; power systems; expert system; heuristic approach; load shedding; power systems; power systems restoration; Appropriate technology; Expert systems; Large-scale systems; Personnel; Power generation; Power generation economics; Power system reliability; Power system restoration; Power system security; Senior members;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.41693
  • Filename
    41693