• DocumentCode
    82525
  • Title

    An Improved Mixed Integer Programming Approach for Multi-Hoist Cyclic Scheduling Problem

  • Author

    Ada Che ; Weidong Lei ; Jianguang Feng ; Chengbin Chu

  • Author_Institution
    Sch. of Manage., Northwestern Polytech. Univ., Xian, China
  • Volume
    11
  • Issue
    1
  • fYear
    2014
  • fDate
    Jan. 2014
  • Firstpage
    302
  • Lastpage
    309
  • Abstract
    This paper addresses the single-track multi-hoist cyclic scheduling problem. In most existing studies, loaded hoist moves are implicitly or explicitly assumed to start and end within the same cycle. We give a counterexample to demonstrate that the optimal solution obtained with such an assumption is not necessarily the best one among all feasible solutions, called globally optimal solution. To obtain a globally optimal solution, we propose an improved mixed integer programming (MIP) approach for the multi-hoist cyclic scheduling problem with relaxation of the above assumption. Computational results on benchmark and randomly generated instances are reported and analyzed.
  • Keywords
    computational complexity; hoists; integer programming; scheduling; MIP approach; globally optimal solution; improved mixed integer programming approach; single-track multihoist cyclic scheduling problem; Cyclic scheduling; mixed integer programming; multi-hoist scheduling;
  • fLanguage
    English
  • Journal_Title
    Automation Science and Engineering, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1545-5955
  • Type

    jour

  • DOI
    10.1109/TASE.2013.2254713
  • Filename
    6522200