Running in of Vicksi and First Operating Experience
Author :
Ziegler, K.
Author_Institution :
Hahn-Meitner-Institut fÿr Kernforschung Berlin GmbH, Bereich Kern- und Strahlenphysik, Berlin, Germany
Volume :
26
Issue :
2
fYear :
1979
fDate :
4/1/1979 12:00:00 AM
Firstpage :
1871
Lastpage :
1878
Abstract :
The assembly of the accelerator combination VICKSI is essentially completed. Six different ions have been accelerated to 15 different energies during the running in and acceptance period. The tests have shown that all essential beam specifications are fulfilled. 1160 hours of beam time for experiments have been scheduled since March of this year. About 60% of that time the beam was actually available. Training of operators, a higher degree of automatic tune up, and finishing the beam transport system to the target areas will be the main task for the coming year.
Keywords :
Acceleration; Assembly; Cyclotrons; Finishing; Ion accelerators; Ion sources; Magnets; Structural beams; Testing; Voltage;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1979.4329769
Filename :
4329769
Link To Document :
بازگشت