DocumentCode
838688
Title
A Proposed RF System for the Fusion Materials Irradiation Test Facility
Author
Fazio, M.V. ; Johnson, H.P. ; Hoffert, W.J. ; Boyd, T.J.
Author_Institution
Los Alamos Scientific Laboratory, Los Alamos, NM 87545
Volume
26
Issue
3
fYear
1979
fDate
6/1/1979 12:00:00 AM
Firstpage
3018
Lastpage
3020
Abstract
Preliminary rf system design for the accelerator portion of the Fusion Materials Irradiation Test (FMIT) Facility is in progress. The 35-MeV, 100-mA, cw deuteron beam will require 6.3 MW rf power at 80 MHz. Initial testing indicates the EIMAC 8973 tetrode is the most suitable final amplifier tube for each of a series of 15 amplifier chains operating at 0.5-MW output. To satisfy the beam dynamics requirements for particle acceleration and to minimize beam spill, each amplifier output must be controlled to ±1° in phase and the field amplitude in the tanks must be held within a 1% tolerance. These tolerances put stringent demands on the rf phase and amplitude control system.
Keywords
Control systems; Laboratories; Linear accelerators; Linear particle accelerator; Particle accelerators; Particle beams; Radio frequency; Radiofrequency amplifiers; Test facilities; Testing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1979.4329924
Filename
4329924
Link To Document