DocumentCode
845906
Title
The SRS: Progress Report on the Dedicated Synchrotron Radiation Source at Daresbury; and Operation of a 600 MeV Booster
Author
Thompson, D.J.
Author_Institution
Daresbury Laboratory, Warrington WA4 4AD, U.K.
Volume
26
Issue
3
fYear
1979
fDate
6/1/1979 12:00:00 AM
Firstpage
3803
Lastpage
3805
Abstract
Design of the 2 GeV Storage Ring is virtually complete and construction will be finished in April 1980. The injector, a 600 MeV 10 Hz synchrotron, has been commissioned and its performance is reported.
Keywords
Acceleration; Klystrons; Laboratories; Linear accelerators; Linear particle accelerator; Magnets; Storage rings; Structural beams; Synchrotron radiation; Undulators;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1979.4330614
Filename
4330614
Link To Document