• DocumentCode
    845906
  • Title

    The SRS: Progress Report on the Dedicated Synchrotron Radiation Source at Daresbury; and Operation of a 600 MeV Booster

  • Author

    Thompson, D.J.

  • Author_Institution
    Daresbury Laboratory, Warrington WA4 4AD, U.K.
  • Volume
    26
  • Issue
    3
  • fYear
    1979
  • fDate
    6/1/1979 12:00:00 AM
  • Firstpage
    3803
  • Lastpage
    3805
  • Abstract
    Design of the 2 GeV Storage Ring is virtually complete and construction will be finished in April 1980. The injector, a 600 MeV 10 Hz synchrotron, has been commissioned and its performance is reported.
  • Keywords
    Acceleration; Klystrons; Laboratories; Linear accelerators; Linear particle accelerator; Magnets; Storage rings; Structural beams; Synchrotron radiation; Undulators;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1979.4330614
  • Filename
    4330614