• DocumentCode
    846977
  • Title

    Cryogenic Supply and Boil-Off Removal for a LHE Cryopump in a 4 Bar SF6 Insulated 1 MV Accelerator

  • Author

    Falter, Hans-Dieter ; Obert, Wolfgang

  • Author_Institution
    Kernforschungszentrum Karlsruhe, IKVT, Karlsruhe
  • Volume
    26
  • Issue
    3
  • fYear
    1979
  • fDate
    6/1/1979 12:00:00 AM
  • Firstpage
    4096
  • Lastpage
    4098
  • Abstract
    Accelerated clusters of the hydrogen isotopes have been considered for plasma heating and fueling. With a 1 MV high power cluster injector, insulated by 4 bar SF6, particle currents up to 100 A equiv. are presently under development. The cluster beam is produced at high voltage potential with a gas efficiency ¿5 %. To pump the corresponding gas load of about 250 mbarl/s a LHe cryopump is installed within the high voltage terminal. The paper describes the supply and boil-off system of the cryopump. The cryogenic storage at high voltage potential, rated for a many hours operation, is supplied by means of a 30 cm i.d. lock through the 4 bar SF6. The boil-off gas is transferred to ground potential during high voltage operation by a voltage controlled polyamid tubing of 19 m in length. This allows a transfer rate of 1.5 l/s even at gas pressures down to 500 mbar. In addition an emergency transfer line can be used having, a transfer rate of 300 l/s, activated only with high voltage switched off. Experiments, where the heat load is buffered by the pressure rise of the cryogenic liquids are also described and discussed.
  • Keywords
    Acceleration; Cryogenics; Heating; Hydrogen; Insulation; Isotopes; Particle accelerators; Plasma accelerators; Sulfur hexafluoride; Voltage;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1979.4330711
  • Filename
    4330711