• DocumentCode
    848049
  • Title

    Overvoltages on a series-compensated 750 kV system for the 10000 MW Itaipu project

  • Author

    Thanassoulis, P. ; de Franco, N. ; Clerici, A. ; Cazzani, M.

  • Author_Institution
    Montreal Engineering (Overseas)Ltd., MEOL/MONASA, Rio de Janeiro, Brazil
  • Volume
    94
  • Issue
    2
  • fYear
    1975
  • fDate
    3/1/1975 12:00:00 AM
  • Firstpage
    622
  • Lastpage
    631
  • Abstract
    The paper summarizes the most significant results of a Transient Network Analyzer study performed for the Itaipu transmission system in Brazil. This study considers an installed capacity of 10000 MW to be transmitted over 900 km from the Itaipu power plant to the São Paulo load area. Fault initiation, fault clearing, energization and reclosing overvoltages on two possible 750 kV ac schemes are mainly described. Emphasis is placed on some special transients which can be associated with series-compensated schemes and which can be of importance to insulation co-ordination, reclosing and equipment specification. Methods for controlling these transients are also proposed.
  • Keywords
    Capacitors; Control systems; Insulation; Power & Energy Society; Power generation economics; Power system economics; Power system protection; Power system reliability; Surges; Voltage;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/T-PAS.1975.31890
  • Filename
    1601492