• DocumentCode
    856067
  • Title

    Operation of TARN

  • Author

    Hirao, Yasuo

  • Author_Institution
    Institute for Nuclear Study, University of Tokyo Midoricho 3-2-1, Tanashi, Tokyo 188, Japan
  • Volume
    28
  • Issue
    3
  • fYear
    1981
  • fDate
    6/1/1981 12:00:00 AM
  • Firstpage
    2086
  • Lastpage
    2088
  • Abstract
    The construction of a Test Accumulation Ring for NUMATRON Project, TARN, was finished and the first injection test was performed successfully in August, 1979. For testing the beam accumulation technology by a combination of multiturn injection and RF stacking, He2+ H+2 and H+ beams of 7 MeV/u were used so far. Through this work, various important technical problems for the NUMATRON were solved.
  • Keywords
    Cyclotrons; Helium; Ion accelerators; Particle beam injection; Performance evaluation; Radio frequency; Stacking; Structural beams; Synchrotrons; Testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1981.4331599
  • Filename
    4331599