Title :
FMIT Alignment Cart
Author :
Potter, R.C. ; Dauelsberg, L.B. ; Clark, D.C. ; Grieggs, R.J.
Author_Institution :
Los Alamos National Laboratory, Los Alamos, New Mexico 87545
fDate :
6/1/1981 12:00:00 AM
Abstract :
The Fusion Materials Irradiation Test (FMIT) Facility alignment cart must perform several functions. It must serve as a fixture to receive the drift-tube girder assembly when it is removed from the linac tank. It must transport the girder assembly from the linac vault to the area where alignment or disassembly is to take place. It must serve as a disassembly fixture to hold the girder while individual drift tubes are removed for repair. It must align the drift tube bores in a straight line parallel to the girder, using an optical system. These functions must be performed without violating any clearances found within the building. The bore tubes of the drift tubes will be irradiated, and shielding will be included in the system for easier maintenance.
Keywords :
Assembly; Boring; Fixtures; Laboratories; Linear particle accelerator; Magnetic separation; Magnetic shielding; Seals; Structural beams; Wire;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1981.4331977