DocumentCode
865724
Title
Initial Operation of the Holifield Facility
Author
Ball, James B.
Author_Institution
Oak Ridge National Laboratory, Oak Ridge, Tennessee 37830
Volume
30
Issue
2
fYear
1983
fDate
4/1/1983 12:00:00 AM
Firstpage
1363
Lastpage
1366
Abstract
The Holifield Facility has been completed and operation for experiments is well under way. Experience to date with operation of the 25 MV Pelletron has shown it to be a sturdy and smoothly operating accelerator. The inability to operate reliably at terminal voltages of 20 MV and above has been a disappointment but we have begun modifications aimed at the problem believed to be the source of this limitation. We are confident that with continued efforts of ORNL and NEC the machine will be brought to full potential. Experience with booster operation of ORIC has been particularly successful and has provided a new range of ion-energy combinations for use in experiments. The long term stability of this operational mode illustrates the power and flexibility of a tandem accelerator as an injector for a cyclotron booster.
Keywords
Buildings; Cyclotrons; Electrostatics; Gas insulation; Ion accelerators; Laboratories; Life estimation; Notice of Violation; Testing; Voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1983.4332533
Filename
4332533
Link To Document