DocumentCode :
867263
Title :
Status of KEK TRISTAN Project
Author :
Nishikawa, T. ; Horikoshi, G.
Author_Institution :
KEK, National Laboratory for High Energy Physics Oho-machi, Tsukuba-gun, Ibaraki-ken, 305, Japan
Volume :
30
Issue :
4
fYear :
1983
Firstpage :
1983
Lastpage :
1987
Abstract :
Status of the KEK TRISTAN project, the Phase I of which has been approved since 1981, is reported with an emphasis on its accelerator design and construction. The design of accelerator complex has mostly been fixed. Construction of accelerator enclosure and production of accelerator components are under way with a target day for the first e+ e- collisions in 1986.
Keywords :
Acceleration; Colliding beam accelerators; Electrons; Laboratories; Linear accelerators; Linear particle accelerator; Physics; Positrons; Proton accelerators; Storage rings;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1983.4332692
Filename :
4332692
Link To Document :
بازگشت