DocumentCode :
878817
Title :
Transient Beam Loading Compensation in the Fermilab Main Ring
Author :
Wildman, D.
Author_Institution :
Fermi National Accelerator Laboratory P. 0. Box 500 Batavia, Illinois 60510
Volume :
32
Issue :
5
fYear :
1985
Firstpage :
2150
Lastpage :
2152
Abstract :
A requirement for bunch coalescing and bunch rotation for antiproton production in the Fermilab Main Ring is that the net rf voltages be reduced below ~1 kV. At high beam intensities, the fields generated by the beam in a single pass through the rf cavities will exceed this limit. The new compensation systemmonitors the component of the beam current at the fundamental rf frequency as a function of time. This information is then delayed by a single turn and fed back into the high level rf system to cancel the beam-induced fields. The system has compensated the beam-induced voltage generated by a single booster batch to 5% of its initial value.
Keywords :
Acceleration; Delay; Filling; Frequency; Impedance; Laboratories; Production; Protons; Shape; Voltage;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1985.4333845
Filename :
4333845
Link To Document :
بازگشت