• DocumentCode
    883144
  • Title

    Simultaneous Slow Resonant Extractions from the SPS with Horizontal Tune-Split

  • Author

    Gyr, M. ; Kissler, K.H. ; Pahud, J.D. ; Péraire, S.

  • Author_Institution
    CERN - 1211 Geneva 23, Switzerland
  • Volume
    32
  • Issue
    5
  • fYear
    1985
  • Firstpage
    2997
  • Lastpage
    2999
  • Abstract
    With the upgrading of the West experimental area it became necessary to extract protons at 450 GeV/c simultaneously towards two experimental zones. However, the corresponding extraction systems are at locations which, when the normal periodicity is maintained, would not allow this procedure. During the time of extraction, the horizontal tune has therefore to be split unequally between two halves of the machine circumference such that the betatron phase difference between the electrostatic septa of the two extraction systems becomes a multiple of 2¿. The separatrix then being the same at both septa entrances, the sharing ratio can easily be adjusted by changing the radial position of the circulating beam relative to the first septum with a compensated bump.
  • Keywords
    Acceleration; Apertures; Control systems; Copper; Electrostatics; Magnetic separation; Particle beams; Physics; Protons; Resonance;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1985.4334253
  • Filename
    4334253