DocumentCode
883171
Title
Kickers and Power Supplies for the Fermilab Tevafron I Antiproton Source
Author
Castellano, T. ; Bartoszek, L. ; Tilles, E. ; Petter, J. ; McCarthy, J.
Author_Institution
Fermi National Accelerator Laboratory, P.O. Box 500, Batavia, IL 60510
Volume
32
Issue
5
fYear
1985
Firstpage
3003
Lastpage
3005
Abstract
The Fermilab Antiproton Source Accumulator and Debuncher rings require 5 kickers in total. These range in design from conventional ferrite delay line type magnets, with ceramic beam tubes to mechanically complex shuttered kickers situated entirely in the Accumulator Ring´s 10-10 torr vacuum. Power supplies are thyratron switched pulse forming networks that produce microsecond width pulses of several kiloamps with less than 30 nanoseconds rise and fall times. Kicker and power supply design requirements for field strength, vacuum, rise and fall time, timing and magnetic shielding of the stacked beam in the accumulator by the eddy current shutter will be discussed.
Keywords
Ceramics; Delay lines; Electron tubes; Ferrites; Magnets; Power supplies; Pulsed power supplies; Space vector pulse width modulation; Thyratrons; Timing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1985.4334255
Filename
4334255
Link To Document