• DocumentCode
    883171
  • Title

    Kickers and Power Supplies for the Fermilab Tevafron I Antiproton Source

  • Author

    Castellano, T. ; Bartoszek, L. ; Tilles, E. ; Petter, J. ; McCarthy, J.

  • Author_Institution
    Fermi National Accelerator Laboratory, P.O. Box 500, Batavia, IL 60510
  • Volume
    32
  • Issue
    5
  • fYear
    1985
  • Firstpage
    3003
  • Lastpage
    3005
  • Abstract
    The Fermilab Antiproton Source Accumulator and Debuncher rings require 5 kickers in total. These range in design from conventional ferrite delay line type magnets, with ceramic beam tubes to mechanically complex shuttered kickers situated entirely in the Accumulator Ring´s 10-10 torr vacuum. Power supplies are thyratron switched pulse forming networks that produce microsecond width pulses of several kiloamps with less than 30 nanoseconds rise and fall times. Kicker and power supply design requirements for field strength, vacuum, rise and fall time, timing and magnetic shielding of the stacked beam in the accumulator by the eddy current shutter will be discussed.
  • Keywords
    Ceramics; Delay lines; Electron tubes; Ferrites; Magnets; Power supplies; Pulsed power supplies; Space vector pulse width modulation; Thyratrons; Timing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1985.4334255
  • Filename
    4334255