• DocumentCode
    883192
  • Title

    Proton Extraction and Transport for Pbar Production in Tevatron I

  • Author

    Dugan, G. ; Harrison, M. ; Johnson, D. ; Dinkel, J. ; Krafczyk, G. ; May, M. ; Merz, W. ; McCarthy, J. ; Tilles, E.

  • Author_Institution
    Fermilab, P.O. Box 500, Batavia, IL 60510
  • Volume
    32
  • Issue
    5
  • fYear
    1985
  • Firstpage
    3009
  • Lastpage
    3011
  • Abstract
    The design, fabrication, and commissioning of the extraction and beam transport systems required for pbar production for the FNAL Antiproton Source will be described. The extraction system utilizes a fast kicker and Lambertson septum magnets to extract in a single turn one booster batch of 120 GeV protons from the FNAL Main Ring. The extracted beam is transported a distance of 174 m by a beam transport system consisting of 12 dipoles and 14 quadrupoles. The last 8 quadrupoles are configured as 4 pairs which focus the beam to a small round spot (radius 0.4 mm) on a pbar production target. The extraction channel is also designed to inject 8 GeV cooled pbars from the Accumulator Ring into the Main Ring, or extract 8 GeV protons from the Main Ring for diagnostic and tune-up work in the Antiproton Source beam lines and rings.
  • Keywords
    Bandwidth; Batch production systems; Educational institutions; Fabrication; Magnets; Orbits; Particle beam injection; Particle beams; Protons; Testing;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1985.4334257
  • Filename
    4334257