DocumentCode :
891156
Title :
Optimal Long-Range Generation Expansion Planning for Hydro-Thermal System Based on Analytical Production Costing Model
Author :
Youn, L.T.O. ; Lee, K.Y. ; Park, Y.M.
Author_Institution :
Department of Electrical Engineering Southern Illinois University Edwardsville, Illinois 62026
Volume :
2
Issue :
2
fYear :
1987
fDate :
5/1/1987 12:00:00 AM
Firstpage :
278
Lastpage :
284
Abstract :
This paper presents a new algorithm for the optimal long-range generation planning for hydro-thermal system. The algorithm is based upon the analytical production costing model developed under the assumption of Gaussian probabilistic distribution of random load fluctuations and plant outages. The optimization problem consists of the master problem to determine the annual investment, and the hydro subproblem to determine the optimal hydro operation. The master problem is formulated as a Hamiltonian minimization problem, and the hydro subproblem is solved using the concept of peak-shaving operation on the original load curve.
Keywords :
Algorithm design and analysis; Analytical models; Convolution; Costing; Fluctuations; Investments; Probability distribution; Process planning; Production planning; Production systems;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.1987.4335119
Filename :
4335119
Link To Document :
بازگشت