DocumentCode
891408
Title
SKF handles FMS material transportation
Volume
66
Issue
8
fYear
1987
fDate
9/1/1987 12:00:00 AM
Firstpage
20
Abstract
Lister-Petter has installed a second FMS at its Dursley plant. In the first system materials handling was carried out by robots but a different approach is employed in the second system.
fLanguage
English
Journal_Title
Production Engineer
Publisher
iet
ISSN
0032-9851
Type
jour
DOI
10.1049/tpe.1987.0147
Filename
4938198
Link To Document