• DocumentCode
    897174
  • Title

    Geotechnical Instrumentation and Data Acquisition System for Site and Preliminary Design Validation at the DOE Waste Isolation Pilot Plant, Eddy County, NM

  • Author

    Howes, E.V. ; Reum, J.W.

  • Author_Institution
    Bechtel National Incorporated, P.O. Box 3965, San Francisco, Ca. 94119
  • Volume
    29
  • Issue
    1
  • fYear
    1982
  • Firstpage
    247
  • Lastpage
    251
  • Abstract
    The WIPP site has unique requirements for monitoring geologic stress build-up, convergence and creep in in-elastic salt rock. The status of site construction activities and the role of geotechnical instrumentation in the WIPP mission are covered including the special problems of deformation and stress measurements in salt. A brief discussion of the geotechnical instruments specified is presented along with the requirements of the readout equipment. Instrument locations, wiring information, data acquisition system block diagrams and functional requirements of the data logger are also shown.
  • Keywords
    Creep; Data acquisition; Foot; Geologic measurements; Instruments; Shafts; Soil measurements; Strain measurement; Stress measurement; US Department of Energy;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1982.4335837
  • Filename
    4335837