DocumentCode
897174
Title
Geotechnical Instrumentation and Data Acquisition System for Site and Preliminary Design Validation at the DOE Waste Isolation Pilot Plant, Eddy County, NM
Author
Howes, E.V. ; Reum, J.W.
Author_Institution
Bechtel National Incorporated, P.O. Box 3965, San Francisco, Ca. 94119
Volume
29
Issue
1
fYear
1982
Firstpage
247
Lastpage
251
Abstract
The WIPP site has unique requirements for monitoring geologic stress build-up, convergence and creep in in-elastic salt rock. The status of site construction activities and the role of geotechnical instrumentation in the WIPP mission are covered including the special problems of deformation and stress measurements in salt. A brief discussion of the geotechnical instruments specified is presented along with the requirements of the readout equipment. Instrument locations, wiring information, data acquisition system block diagrams and functional requirements of the data logger are also shown.
Keywords
Creep; Data acquisition; Foot; Geologic measurements; Instruments; Shafts; Soil measurements; Strain measurement; Stress measurement; US Department of Energy;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1982.4335837
Filename
4335837
Link To Document