• DocumentCode
    897822
  • Title

    Using new technology to improve reliability of an industrial cable distribution system

  • Author

    Morrison, Wesley G. ; Arhart, Richard J.

  • Author_Institution
    E.I. Du Pont de Nemours & Co., Newark, DE, USA
  • Volume
    28
  • Issue
    2
  • fYear
    1992
  • Firstpage
    275
  • Lastpage
    281
  • Abstract
    Service history of medium-voltage power cables on US plant sites of a major industrial manufacturer from 1961 to 1990 is summarized. In past years, this company tended to be reactive, using specifications, diagnostic testing, and maintenance practices to manage the reliability of their cable distribution systems. Several new technologies in insulation systems, terminations, splices, and installation techniques introduced in recent years have allowed a more proactive stance to be taken. In addition, because of some specific failure problems, a highly qualified in-house team has been formed to evaluate existing and future technologies and new insulation materials to assure a reliable cable system
  • Keywords
    distribution networks; power cables; reliability; US plant sites; cable splices; industrial cable distribution system; insulation materials; insulation systems; medium-voltage power cables; reliability; terminations; Cable insulation; History; Maintenance; Manufacturing industries; Medium voltage; Power cable insulation; Power cables; Power system management; Power system reliability; System testing;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/28.126729
  • Filename
    126729