• DocumentCode
    904917
  • Title

    Assembly and Installation of the 2-MeV FMIT Accelerator

  • Author

    Liska, D. ; Michelotti, R.

  • Author_Institution
    AT-4, MS H821 Los Alamos National Laboratory, Los Alamos, NM 87545
  • Volume
    30
  • Issue
    4
  • fYear
    1983
  • Firstpage
    3620
  • Lastpage
    3622
  • Abstract
    The front end of the 35-MeV Fusion Materials Irradiation Test (FMIT) Facility accelerator is being assembled and installed at Los Alamos. The machine ultimately will produce a 500-kW continuous duty beam at 5 Mev, although only the first 2-MeV will be installed this year. The 2-MeV system will include the most powerful radio frequency quadrupole (RFQ) in existence. The assembly and installation of the hardware are described, along with the unique problems arising from the large size and high power of the components involved.
  • Keywords
    Acceleration; Assembly; Hardware; Instruments; Laboratories; Life estimation; Materials testing; Particle beams; Prototypes; Radio frequency;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1983.4336745
  • Filename
    4336745