Title :
A Preliminary Evaluation of the U. S. Nuclear Regulatory Commission´s Standard Review Plan with Regard to Relicensing
Author :
Jacobs, Patrick T.
Author_Institution :
Idaho National Engineering Laboratory EG&G Idaho, Inc. P. O. Box 1625 Idaho Falls, Idaho 83415 (208) 526-6002
Abstract :
A preliminary evaluation of the U. S. Nuclear Regulatory Commission´s (NRC´s) Standard Review Plan (SRP) was conducted with the goal of identifying areas that might need revision if the SRP is used for relicensing/license renewal. The SRP is presently used to guide NRC staff reviewers in assessing safety analysis reports submitted by applicants for construction permits and operating licenses for nuclear power plants. The paper summarizes the findings and recommendations based on the evaluation.
Keywords :
Aging; Inductors; Jacobian matrices; Laboratories; Licenses; Performance analysis; Performance evaluation; Power engineering and energy; Power generation; Safety;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1987.4337411