Title :
Making a Multiplant Supplier Rating System Produce
Author :
Goldin, Paul Jay
Author_Institution :
Radio Corporation of America, Camden, New Jersey
fDate :
6/1/1959 12:00:00 AM
Keywords :
Casting; Concrete; Costs; Electrical equipment industry; Inspection; Job shop scheduling; Materials testing; Quality control; Resistors; Statistics;
Journal_Title :
Reliability and Quality Control, IRE Transactions on
DOI :
10.1109/IRE-PGRQC.1959.5007204