Operational experiences from WTS-3 wind turbine, Maglarp, Sweden
Author :
M¿¿ller, L. ; Olsson, G.
Author_Institution :
Karlskronavarvet AB, After Sales Department, Department M1, Karlskrona, Sweden
Volume :
134
Issue :
5
fYear :
1987
fDate :
5/1/1987 12:00:00 AM
Firstpage :
431
Lastpage :
434
Abstract :
Operational experiences with a 3 MW wind turbine are described in the paper, covering two years of successful operation after commissioning. The total operation time covered by the paper is 7500 h, and total power production 11 500 MWh, including operation during precommissioning tests. Availability has been 63%.
Keywords :
wind turbines; 11500 MWh; 3 MW; 63% availability; 7500 h; Maglarp; Sweden; WTS-3 wind turbine;
fLanguage :
English
Journal_Title :
Physical Science, Measurement and Instrumentation, Management and Education - Reviews, IEE Proceedings A
Publisher :
iet
ISSN :
0143-702X
Type :
jour
DOI :
10.1049/ip-a-1.1987.0065
Filename :
4647935
Link To Document :
بازگشت