Abstract :
Operational experiences with a 3 MW wind turbine are described in the paper, covering two years of successful operation after commissioning. The total operation time covered by the paper is 7500 h, and total power production 11 500 MWh, including operation during precommissioning tests. Availability has been 63%.
Keywords :
wind turbines; 11500 MWh; 3 MW; 63% availability; 7500 h; Maglarp; Sweden; WTS-3 wind turbine;